custom engineering

custom engineering

concept to completion

Lode King Suspension fixture update
Monday, 28 September 2015 13:54

This past month has been a busy time finishing up some fairly large projects.  One of them was the suspension assembly fixture for Lode King.  The fixture itself was welded up quite a few months ago.  This past month, the ALM automotive lift components arrived so the assembly of the fixture onto the lift device was almost completed.  This is a very impressive structure.  Here is a a picture of the fixture attached to the lift device with the trailer components and axles in place and one of Mike from Norjen Consulting hard at work.

 
Meridian Welding Cell
Monday, 28 September 2015 10:37

Spectrum Engineering is very pleased to be involved in the design and fabrication of a robotic welding cell for Meridian Manufacturing.  One of our tasks was to design and fabricate the pedestals for the robots to be mounted to.  These pedestals have been completed and delivered to our shop for set up and testing.  Hin Yat was the main designer of these pedestals and quite proud of his work!

Last Updated on Friday, 11 December 2015 10:39
 
Lode King Suspension Assembly Fixture
Friday, 05 June 2015 13:13

Lode King asked Spectrum to design a new assembly fixture for building the heavy duty suspension frames for one of their lines.  John spent 2 days with them in the shop assembling the fixture.  The assembly went very smoothly.  Lode King provided a great team with very skilled people.

These are all of the parts before any assembly began.

 

 

 

 

 

 

This was the progress made at the end of day one

This was the progress made after Day One

 

 

 

 

 

 

 

The fixture very near completion at the end of Day Two!

 
<< Start < Prev 1 2 3 4 Next > End >>

Page 3 of 4