Pedestrian & Golf Course Bridges

Boathouse Bridge

Installation May 27, 2025 This bridge connected the cottage deck to the upper level of the boathouse dock for direct access removing the need for climbing stairs. There was no direct access from the road to the back of the cottage so a helicopter was used to install it. The bridge was designed and fabricated by Spectrum Engineering and installed together with Krest Carpentry. Krest built the boathouse and managed the project.

Bridges Designed, Fabricated and Installed by Spectrum Engineering Inc.